Kia Process Design Engineers
  • Home
  • Projects
    • Completed Projects
    • Current Projects
  • Services
    • Engineering Design
      • Process
      • Mechanical
      • Piping
      • Electrical
      • Instrumentation
      • Civil
      • Water & Wastewater
      • HSE
      • Planning
    • Executive Management
      • Industrial Piping Installation
      • Electrical & Instrumentation Installation
      • Equipment Installation
      • Commissioning & Startup
    • Management Of Contracting
    • Technical Inspection
  • Events
    • Articles
  • About Us
  • Contact us
031-33931347-48 info@kia-pde.com
031-33931347-48 info@kia-pde.com
Kia Process Design Engineers Kia Process Design Engineers
  • Home
  • Projects
    • Completed Projects
    • Current Projects
  • Services
    • Engineering Design
      • Process
      • Mechanical
      • Piping
      • Electrical
      • Instrumentation
      • Civil
      • Water & Wastewater
      • HSE
      • Planning
    • Executive Management
      • Industrial Piping Installation
      • Electrical & Instrumentation Installation
      • Equipment Installation
      • Commissioning & Startup
    • Management Of Contracting
    • Technical Inspection
  • Events
    • Articles
  • About Us
  • Contact us

Completed Projects

HomeprojectsArchive by "Completed Projects"

Engineering & Construction of Slaughterhouse

Completed Projects
تصفیه خانه پساب صنعتی

Process Modification of Wastewater Clarifier for Karoon Petrochemical Co.

Completed Projects

Design & Construction of a DAF Package for Chadormaloo Mine

Completed Projects

Design, Procurement, Installation & Commissioning of Gas Compressor Instrumentation for Salman Gas Plant

Completed Projects

Conceptual Design, Basic and Detail Engineering of Wastewater Treatment Unit of Petro Polymer Shargh Co. Ordered by Pars Arian Ab Co.

Completed Projects

Engineering, Consulting & UF Package Construction for Varagh Khodro Co.

Completed Projects

Design & Construction Bio-Ethanol Dewatering Unit to Produce Bio-Ethanol 99.5% (Fuel Grade)

Completed Projects

Feasibility Study on Construction and Outfit of Central Laboratory of Fars Chemical Industry Technology Complex

Completed Projects

Conceptual Design, Basic & Detail Engineering and Construction of Mastic Gum Production Unit Ordered by Isfahan University of Technology

Completed Projects

Design & Construction of Coagulation, Flocculation and Filtration for Pars Decor Co.

Completed Projects

Portable Wastewater Unit (UF & RO Filtration) for Slaughterhouse Complexes

Completed Projects

Conceptual Design, Basic and Detail Engineering & Construction of Bio-Ethanol Production Unit Ordered by Isfahan University

Completed Projects

Procurement for Wastewater Treatment Unit in Mandegar Textile Co.

Completed Projects

Technical Consulting in Wastewater Treatment Plant for Borjian Dairy Complex

Completed Projects

Process Modification of Wastewater Clarifier for Mobarakeh Steel Company

Completed Projects
Loading projects
Something went wrong, please try again later or contact the site administratorX

Kia Process Design Dngineers


KIA engineers obtained valuable experiences during many projects and it is ready for implementation various services such as Detail Engineering, Installation, Start-up, Consulting, Inspection, Maintenance and so on, based on it’s academic & industrial expert person

 
contact us
Please enter your name.
Invalid or empty email.
Please enter your message.
send
Your message successfully sent.
Something went wrong. Your message was not send.
latest projects
تصفیه خانه پساب صنعتی

© 2018 Kia Process Design Engineer All Rights Reserved

Powered By Mani-Group